Converting an Old Building into a Hotel: The New Policy Says the Original Land Use Can Stay, but What Other Approvals Does the Owner Still Need?
Key Takeaway
The three-ministry Opinions allow a land rights holder, where planning controls, safety and other requirements are met, to keep the original land use when using existing property to set up cultural and tourism visitor reception facilities. This article explains what that relaxation covers, that whether a hotel is included depends on local confirmation, and the order, approving authority and stopping conditions of the five steps: land, planning and construction permits, fire protection design review or filing, the pre-opening fire safety inspection, and the special industry license.
Reviewed by the MarvelBros C&T professional team
What the new policy relaxes is the land step. Provided that planning controls, safety and other requirements are met, a land rights holder that uses existing property to set up cultural and tourism visitor reception facilities may keep the original land use and type of land rights unchanged. The policy does not say that the planning and construction permits, the fire protection design review or filing, the pre-opening fire safety inspection or the special industry license can be waived. The owner still has to obtain a written result at each of these steps, in order.
The provision comes from the Guiding Opinions on Optimizing the Allocation of Natural Resources to Promote the Standardized and Orderly Development of Tourism, issued by the Ministry of Natural Resources, the Ministry of Culture and Tourism and the National Forestry and Grassland Administration. The document is dated July 23, 2026, and was made public by the Ministry of Culture and Tourism on September 15. It does remove one procedure for owners of vacant office buildings, commercial buildings or factories. But "the land use need not change" and "this building can open as a hotel" are two different things.
Which step does the new policy actually relax?
Land use is what the land grant contract or allocation document says the plot is for, such as commercial, office or industrial use. Under Article 18 of the Urban Real Estate Administration Law of the People's Republic of China, changing the land use agreed in a land grant contract requires the consent of the grantor and the city planning authority, an amended or new grant contract, and a corresponding adjustment to the land grant premium. Article 4 of the Opinions lets qualifying projects skip this step. Where land use procedures are applied for, they may, once approved, be handled by agreement: the authority negotiates directly with the existing rights holder instead of going through tender, auction or listing. How much this saves depends on local land prices and the original contract, and this article does not estimate it.
The relaxation comes with three conditions. First, planning and safety are prerequisites, not results that follow automatically once the rule is relaxed. Second, it applies to the "land rights holder." If the building is leased, the text does not say whether a tenant converting it into a hotel is covered. Third, existing industrial land and old factories get a separate five-year transition period, but the land user and the planning conditions must not change; only the land use category may differ. Planning conditions are the indicators the planning authority sets for a plot, such as floor area ratio and building height. A project that adds floors or floor area, or moves the property into a different company, cannot use this policy.
Article 5 of the Opinions also states that using tourism projects as a pretext to change the current state of land or its planned use without authorization, in order to build villas, private estates or real estate developments, is strictly prohibited.
The Opinions do not say what happens when the transition period ends. The general rule is in Article 20 of the Guidelines for the Implementation of Industrial Land Use Policies (2019 Edition), issued by the General Office of the Ministry of Natural Resources: the transition period is limited to five years. When it expires, or a transfer requires changing the land user and planning conditions, the procedures may be handled by agreement, except where the land qualifies under the Catalogue of Allocated Land to remain allocated, and except where rules or the contract require the land to be taken back and granted again. This article does not infer whether the new Opinions will follow the same approach. For financial modelling, one option is to test payback over five years first and list land costs from year six onward as an unknown.
Does a hotel count as a "cultural and tourism visitor reception facility"?
The Opinions do not define the term and do not mention hotels. Some local documents on converting building functions already name hotels explicitly. That is not an interpretation of "visitor reception facilities," but it does show the local stance. The Implementation Opinions of the General Office of the Shanghai Municipal People's Government on Promoting the Renewal and Upgrading of Commercial Office Buildings (Hu Fu Ban Fa [2025] No. 13) allow commercial office buildings in district centers to accommodate compatible functions such as commercial hotels. The Zhuhai Measures for the Administration of the Temporary Change of Existing Commercial and Office Buildings to Hotel Use (Trial) (Zhu Zi Ran Zi [2026] No. 234), issued by the Zhuhai Natural Resources Bureau in June 2026, define hotel use as hotels, guesthouses and inns mainly providing accommodation, with a change period of no more than five years.
Both documents predate the three-ministry Opinions and apply only to their own cities. As of November 10, 2026, this article found no local implementing rules issued after the Opinions specifically to carry out this provision. Whether an owner's city treats hotels as visitor reception facilities should be confirmed by a written reply from the local natural resources authority.
After land, in what order do the approvals for converting an old building into a hotel run?
The five steps are listed below in sequence. Each one sets out who approves it, what triggers it, and which investment decision is blocked if it fails.
Step 1: Land. Who approves: the local natural resources authority. Trigger: converting existing property into a hotel while keeping the original land use. What to obtain: a written reply on whether the project can proceed under the original land use. If it fails, it blocks: signing a brand or management contract and paying a brand deposit.
Step 2: Planning and construction permits. Who approves: the local planning and housing and urban-rural development authorities, with the division of responsibilities varying by locality. Trigger: changing the building's use, or renovation that affects structure, floor area or facade. What to obtain: written opinions on the planning and construction procedures and, where load-bearing structures are altered, a design scheme from a design institute. If it fails, it blocks: producing construction drawings and fixing the total fit-out cost.
Step 3: Fire protection design review or filing. Who approves: the housing and urban-rural development authority. Trigger: tiered by the size of the converted hotel. Projects with a total floor area above 10,000 square meters go through design review and fire protection acceptance; all others go through acceptance filing. What to obtain: a design review approval or a filing certificate. If it fails, it blocks: a special construction project cannot start work if it fails the design review, and a filing project must stop being used if it fails the spot check on its acceptance filing.
Step 4: Pre-opening fire safety inspection. Who approves: the local fire and rescue agency. Trigger: a hotel is a public gathering place and must complete this before it is put into use or opens for business. What to obtain: a pre-opening fire safety inspection permit. If it fails, it blocks: opening, and going live on booking platforms.
Step 5: Special industry license. Who approves: a local public security authority at or above the county level. Trigger: operating a business that accommodates guests. What to obtain: a special industry license. If it fails, it blocks: accepting guests.
Steps 1 and 2 can be raised at the same time, one about the land and one about the building. The structural conclusion from Step 2 must come before the fire protection design in Step 3; otherwise the fire protection plan may rely on walls that cannot be moved.
How do different localities handle planning and structure?
The Beijing Guiding Opinions on Mixed Use of Construction Land Functions (Trial) (Jing Gui Zi Fa [2023] No. 313), issued in 2023 by the Beijing Municipal Commission of Planning and Natural Resources, state that once a change of use for an existing building is approved, planning and construction procedures must be completed in accordance with the law. Under the Zhuhai measures, projects approved by the district government are exempt from applying for a construction project planning permit, provided they do not increase floor area, height or number of floors, do not change the style of the facade, and do not affect structural safety; the renovation must still go through approvals under the rules of the construction, fire protection and industry authorities. In Dongguan's positive list, conversion to accommodation appears only under commercial and office buildings, not under factories.
Structural safety has not been relaxed. Zhuhai requires applicants to engage a design institute with the appropriate qualifications to confirm that the building will meet structural and fire safety codes after the change of use. Article 15 of the Regulations on the Quality Management of Construction Projects provides that, for renovation involving changes to the main structure or load-bearing structure, the original design institute or a design institute with the appropriate qualifications must produce a design scheme before work starts, and no work may start without one.
Why look at fire protection by floor area tier?
Article 14 of the Interim Provisions on the Administration of Fire Protection Design Review and Acceptance of Construction Projects lists hotels and guesthouses with a total floor area above 10,000 square meters as special construction projects. Such projects may not start construction without passing the fire protection design review, and may not be put into use without passing the fire protection acceptance inspection. Projects of 10,000 square meters or less are treated as other construction projects subject to filing and spot checks, and must stop being used if they fail the spot check.
A change of use can move a building into a different tier. An office building that was not a special construction project becomes one when the whole building is converted into a hotel of more than 10,000 square meters, and construction then has to wait for the review result. The applicable standards may also change. Guangzhou's measures on renovating and reusing existing buildings require projects that change use to follow current national fire protection technical standards for construction, not the standards in force when the building was built.
Why are the pre-opening inspection and special industry license more than a formality?
Article 73 of the Fire Protection Law of the People's Republic of China lists hotels and guesthouses as public gathering places, and Article 15 subjects their pre-opening fire safety inspection to the notification-and-commitment system. Commitments are followed by verification. Under Article 58, if verification finds that the actual use or operation does not match the commitment, the venue will be ordered to stop using the premises or suspend operations and fined between RMB 30,000 and RMB 300,000. If it fails to correct the problem within the deadline, or still does not meet the requirements after correction, the permit will be revoked in accordance with the law.
Article 4 of the Measures for the Administration of Public Security in the Hotel Industry provides that a hotel may open only after obtaining a business license and applying to the local public security authority for a special industry license. A 2023 notice from the Fujian Provincial Public Security Department adopted the notification-and-commitment system and requires that, once a license is issued, the premises be reported in writing to the market regulation, housing and urban-rural development, natural resources, emergency management and rescue and other authorities at the same level. Gaps left over from earlier steps may surface here.
The following is an illustrative example, not a real project: an owner has an eight-story old office building of about 12,000 square meters on land granted to the owner. Once converted into a hotel, it exceeds 10,000 square meters and becomes a special construction project. If the design institute confirms that extensive reinforcement is needed, or the fire protection plan calls for a new evacuation staircase that the building cannot accommodate, the owner should pause before spending the design fee and fit-out budget, and compare converting only some floors or switching to another use.
When should you stop?
If any of the following occurs, the decision should go back to the investment committee: the locality does not accept proceeding under the original land use, and the cost of changing the land use breaks the financial model; the cost or timeline of structural reinforcement exceeds what is acceptable; fire protection cannot meet current standards; a factory project would need a new holding entity or changed planning conditions; or payback takes longer than five years and land arrangements from year six onward remain unclear.
Roles should be settled first. The owner or the investment committee sets the acceptable investment and payback period. The project lead organizes the approvals in sequence. Legal counsel and the design institute each provide written opinions. Finance updates the model each time a step's result comes in. Whether the project is on track should be judged by whether each step's written result is in hand, not by how many rounds of renderings have been revised.
This sequence is designed for old office buildings, commercial buildings and factories in cities. Rural homestays, residential building conversions and heritage buildings are subject to separate rules or restrictions, and this sequence should not be applied to them. This article is a method for organizing investment decisions. It does not replace legal advice, engineering assessment or approval decisions on a specific project.
Further reading
Buying an Operating Hotel: Which Property Issues Should You Verify Before Modelling Returns? https://www.marvelbros.com/en/knowledge/operating-hotel-property-due-diligence-before-returns-2026-10-26
References
Three-ministry Guiding Opinions, Articles 4 and 5. https://zwgk.mct.gov.cn/zfxxgkml/cyfz/202609/t20260915_967154.html
Urban Real Estate Administration Law, Article 18. https://ghzrzyw.beijing.gov.cn/zhengwuxinxi/zcfg/fl/201912/t20191213_1166993.html
Guidelines for the Implementation of Industrial Land Use Policies (2019 Edition), Article 20. https://www.gov.cn/zhengce/zhengceku/2019-10/14/content_5439551.htm
Shanghai, Hu Fu Ban Fa [2025] No. 13. https://ghzyj.sh.gov.cn/zcwj/cxgh/20250804/90c43ba26e7f48d3b359851b1dbee491.html
Zhuhai, Zhu Zi Ran Zi [2026] No. 234. https://www.zhuhai.gov.cn/zw/fggw/gfxwj/bmgfxwj/content/post_3916114.html
Beijing, Jing Gui Zi Fa [2023] No. 313. https://www.beijing.gov.cn/zhengce/zhengcefagui/202401/t20240102_3522266.html
Dongguan Measures for Joint Planning and Fire Protection Review of Changes in Use of Existing Buildings, Article 5. https://zjj.dg.gov.cn/gkmlpt/content/4/4460/post_4460086.html
Regulations on the Quality Management of Construction Projects, Article 15. https://xzfg.moj.gov.cn/front/law/detail?LawID=537
Interim Provisions on the Administration of Fire Protection Design Review and Acceptance of Construction Projects, Articles 14, 15, 27 and 34. https://www.gov.cn/zhengce/202309/content_6901878.htm
Guangzhou Measures for the Administration of Fire Protection Design Review and Acceptance for the Renovation and Reuse of Existing Buildings, Article 6. https://www.gz.gov.cn/gfxwj/szfgfxwj/gzsrmzfbgt/content/post_10119455.html
Fire Protection Law, 2021 Amendment, Articles 15, 58 and 73. https://www.beijing.gov.cn/zhengce/zhengcefagui/qtwj/202307/t20230726_3207767.html
Measures for the Administration of Public Security in the Hotel Industry, Article 4. https://xzfg.moj.gov.cn/front/law/detail?LawID=694
Decision of the State Council on Establishing Administrative Licensing for Administrative Approval Items That Must Be Retained, Item 36. https://www.gov.cn/zwgk/2005-06/20/content_7908.htm
Fujian, Min Gong Zong [2023] No. 2. https://fgw.fujian.gov.cn/ztzl/fjys/yszc/sjzc/202301/t20230113_6094222.htm
Further reading
Explore these related questions
Deep dive
Professional Insights
As Asset-Light Hotel Groups Expand, Where Should They Allocate Funds to Win Contracts?
Should an asset-light hotel group use incremental resources to win contracts hotel by hotel, or strengthen systems and owner-support capabilities? Start with the reasons for wins and losses, distinguish cash payments to obtain contracts from technology reimbursements and guarantees, and test funding choices against contract quality, net cash from fees and ongoing spending.
Read nextExecution method
Professional Insights
Running a Hotel in Leased Premises: How Does the Remaining Lease Term Constrain Payback and Valuation?
When a hotel operates in leased premises, the renovation investment has to be recovered within the enforceable remaining lease term. A renewal belongs in a scenario, not in the base case.
Read nextRelated framework
Hotel investment framework
Assess project viability, brand choice, returns, and risk.
View frameworkRelated cases
See how similar hotel issues are broken down
Cases focus on explainable context, judgment, and method rather than unverified numbers.
View casesDiscuss your hotel
Assessing a hotel project?
Start with the project stage and the hardest question to answer, then decide whether a further conversation is useful.
Does this article relate to your hotel?
Tell us your project stage and the question you find hardest to answer. The article reference will accompany your enquiry.
Ask about this articleAll rights reserved. Please credit MarvelBros C&T when sharing.