Before a Rebranded Hotel Reopens, the Most Overlooked Item Is the Opening Sequence
Reflag pre-opening's biggest trap: treating it as a checklist, not a sequence. Five steps—confirm standards, switch channels, drill training, trial ops, review—in right order lift OCC 15–20 points.